HPP BOBROWICE IV

Investor: Jeleniogórskie Elektrownie Wodne Sp. z o.o.

A new hydropower plant commissioned in 2008. Delivery of two hydro sets with 550kW asynchronous generators together with control systems and power output. Vertical tubular Kaplan turbines with a rotor diameter of D = 1200mm. Hydro generator regulators cooperate with the power plant’s master regulator. The master controller also controls the operation of the EW Bobrowice III hydroelectric power plant and the relief valve. The SCADA system provides local and remote monitoring and the ability to control the operation of hydro units. Two-stage upper water level measurement system. Hydraulically operated inlet and discharge sliders.