HPP CZARNOCIŃSKIE PIECE

Investor: Energa Hydro Sp. z o.o.

Modernization of the existing power plant completed in 2009. Delivery of a hydro-unit with a 300kW synchronous generator with a power evacuation system and a SCADA system. Horizontal Kaplan tubular turbine with a rotor diameter of D = 1200mm. The hydro unit regulator enables operation on a separate network with automatic frequency control and cooperates with the weir regulator. The SCADA system makes it possible to monitor and control the operation of the hydro unit locally. The delivery also included an automatically controlled chain inlet grill cleaner.