HPP LIKOWO

Investor: Elektrownie Wodne Sp. z o. o. Branch Płoty

Modernization completed in 2012. It included the replacement of all technological equipment of the power plant. Additionally, a control system was provided which included the control over the operation of the generating systems with auxiliary devices, discharge gate valve, weir, generator set, grate cleaner, scraper conveyor. The operation of the power plant is supervised by the SCADA system enabling remote access. The visualization application is connected with the SCADA system launched at EW Rejowice and allows you to supervise the power plant 24 hours a day. Increased installed capacity to 945kW.