HPP REJOWICE

Investor: Elektrownie Wodne Sp. z o.o. Płoty branch

Modernization completed in 2011. It covered the replacement of all technological equipment of the power plant, except for the MV switching station. In addition, a control system was provided that included control over the operation of the generating systems with auxiliary devices, a relief valve, a generating set, and a grate cleaner. The operation of the power plant is supervised by the SCADA system enabling remote access. The visualization application is connected to the SCADA system launched in EW Likowo and allows you to supervise the facility, 20 km away, 24 hours a day.